The 2018 Highway Safety Improvement Program (HSIP) Call for Projects (CFP) opened June 4, 2018. The 2018 HSIP CFP closes/deadline is August 15, 2018.
Program Contacts:
Dallas District
Tamara Gart: tamara.gart@txdot.gov; 214-320-4490
Scott Carter: scott.carter@txdot.gov; 214-320-6263
Fort Worth District:
Quadeer Mohammed: mohammed.quadeer@txdot.gov; 817-370-6705
Paula Meyer: paula.meyer@txdot.gov: 817-370-6888
The following categories are eligible for the 2018 HSIP Call for Projects:
- Barriers and Safety Treat Fixed Object - Add or upgrade barrier or metal beam guard fence to safety treat a fixed object or drainage structures.
- Curves – Construct improvements on horizontal curves to prevent run-off the road and head-on crashes.
- Grade Separation – Construct a vertical separation of a highway intersection (conventional diamond interchange).
- HSIP (Misc. Safety) – Any safety improvement that addresses an emphasis area in the SHSP but is not categorized in one of the other seven categories.
- Intersection – Improvements to an intersection, such as signals, signage, lighting, and pedestrian improvements, other than a grade separation.
- Off-System – Any safety improvement to a road off the State highway system, which addresses an emphasis area in the SHSP. Intersections of off-system roads with on-system highways are not considered off-system projects. The local government is responsible for 10 percent of the funding.
- Rumble Strips - Add edgeline or centerline rumble strips to a highway to prevent run-off the road and head-on crashes.
- Widen – Increase paved surface width of rural highways with current pavement width less than 24 feet and ADT greater than or equal to 400 vehicles per day to provide from 26 feet to 28 feet of paved surface width.
Please see the following documents related to the 2018 HSIP Call for Projects:
2018 HSIP Call Overview (Coming Soon)
2018 HSIP Submission Form
2018 Instructions for Submission Form
2018 Instructions for Off-System Project Submission
2018 Instructions for On-System Project Submission
2018 Work Code Combinations Microstrategy
Average Bid Prices as of 04/20/18
Additional resources:
TxDOT HSIP information can be accessed on the Highway Safety Engineering Forms and Publications web page.
2017 HSIP Approved Projects
The TxDOT Dallas District and the TxDOT Fort Worth District 2017 HSIP Call for Projects closed on May 24, 2017.
Fifteen projects in TxDOT Fort Worth District were selected. Final approved projects, totaling an estimated $4,042,584, are available for viewing here.
Thirty-one projects in TxDOT Dallas District were selected. Final approved projects, totaling an estimated $25,208,101, are available for viewing here. |